Amanote Research
Register
Sign In
Weak Links and Countermeasures in Project Cost Control
doi 10.2991/iemetc-17.2017.104
Full Text
Open PDF
Abstract
Available in
full text
Date
January 1, 2017
Authors
Ke Liu
Publisher
Atlantis Press
Related search
Project Bidding and Cost Control
Excess Current in Shunted Josephson Weak Links
Journal of Applied Physics
Astronomy
Physics
Impact of Real-Time Project Control on Capital Project Cost and Schedule Performance
Organization, Technology & Management in Construction: An International Journal
Monitoring Systems and Their Effectiveness for Project Cost Control in Construction
International Journal of Project Management
Management
Monitoring
Business
International Management
Innovation
Policy
Management of Technology
Law
Thermal and Quantum Decay of Supercurrent in Highly Transparent Weak Links
European Physical Journal: Special Topics
Materials Science
Theoretical Chemistry
Physics
Astronomy
Physical
Semiconductor Heterostructure Weak Links for Josephson and Superconducting FET Applications
IEEE Transactions on Magnetics
Electronic Engineering
Optical
Electrical
Magnetic Materials
Electronic
Study on Common Problems and Countermeasures of Construction Cost
Research on the Dynamic Cost Management of the Construction Project and the Optimization of the Cost Control
Study on Construction Project Cost Control Based on Lean Construction Thought