Corrigendum to ”Extended Model Formulation of the Proportional Lot-Sizing and Scheduling Problem With Lost Demand Costs”

Decision Making in Manufacturing and Services
doi 10.7494/dmms.2014.8.1.41
Full Text
Abstract

Available in full text

Date
Authors
Publisher

AGHU University of Science and Technology Press