Amanote Research

Amanote Research

    RegisterSign In

MI Gap Clearing Kicker Magnet Design Review

doi 10.2172/960265
Full Text
Open PDF
Abstract

Available in full text

Date

October 1, 2008

Authors
Chris Jensen
Publisher

Office of Scientific and Technical Information (OSTI)


Related search

The Timing and Diagnostic Systems of the Kicker Magnet Pulsers for the Stanford Linear Collider

English

Conversion of Rome Plow, KGBA7E Clearing Blade, to Minefield-Clearing Plow: Design Data Package

1983English

Reduction of Outgassing From the Ferrite Cores in the Kicker Magnet of J-Parc 3-GeV Rapid Cycling Synchrotron

Journal of the Vacuum Society of Japan
SurfacesInstrumentationInterfacesSpectroscopyMaterials Science
2013English

Lattice and Magnet Design Assumptions

1985English

Design Concept for AGS Injection Kicker Upgrade to 2 GeV

English

Design of the Modulator for the CTF3 Tail Clipper Kicker

2007English

Calculation of Field of Spectrometric Magnet With 0.13 M Gap

EPJ Web of Conferences
AstronomyPhysics
2019English

Design of Longitudinal Feedback System Kicker for the PLS Storage Ring

English

Design Considerations of Fast Kicker Systems for High Intensity Proton Accelerators

English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy