Amanote Research
Register
Sign In
A Two-Stage Priority-Based MOGA for Materials Allocation and Loading Problem in Large-Scale Emergencies
Revista de la Facultad de Ingenieria
- Venezuela
doi 10.21311/002.31.4.03
Full Text
Open PDF
Abstract
Available in
full text
Categories
Earth
Engineering
Planetary Sciences
Date
November 1, 2016
Authors
Unknown
Publisher
Facultad De Ingenieria Universidad Del Zulia
Related search
Supply Allocation and Vehicle Routing Problem With Multiple Depots in Large-Scale Emergencies
A Stochastic Location and Allocation Model for Critical Items to Response Large-Scale Emergencies: A Case of Turkey
International Journal of Optimization and Control: Theories and Applications
Control
Applied Mathematics
Optimization
Technology for Information Gathering and Sharing in Large-Scale Emergencies
Prehospital and Disaster Medicine
Emergency Nursing
Emergency Medicine
Control and Data Channels Allocation for Large-Scale UWB-based WSNs
A Loading Model for an OWC Caisson Based Upon Large-Scale Measurements
Coastal Engineering
Ocean Engineering
Environmental Engineering
Prophet Address Allocation for Large Scale MANETs
Ad Hoc Networks
Hardware
Computer Networks
Software
Architecture
Communications
Two-Archive2 Algorithm for Large-Scale Polygon Targets Observation Scheduling Problem
DEStech Transactions on Computer Science and Engineering
Priority-Based Human Resource Allocation in Business Processes
Lecture Notes in Computer Science
Computer Science
Theoretical Computer Science
Priority-Based Resource Allocation for RT and NRT Traffics in OFDMA Systems