Amanote Research

Amanote Research

  • Register
  • Sign In

Knowledge Gained From Instrumentation of the Kishwaukee River Bridge

PCI Journal- United States

doi 10.15554/pcij.09011983.32.53

Full Text

Abstract

Available in

Categories

BuildingMaterials ScienceCivilStructural EngineeringConstructionMechanics of Materials

Date

September 1, 1983

Authors

K. Nam ShiuHenry G. Russell

Publisher

Precast/Prestressed Concrete Institute


Related search

Knowledge Gained From Twitter Data

2016English

Students’ Perceptions of Knowledge Gained From Business Research Methods Course

2019English

Knowledge Lost - Or Gained? The Changing Knowledge Base of Danish Social Work

Nordic Social Work Research
2018English

Estimating Ultimate Recoveries of Unconventional Reservoirs: Knowledge Gained From the Developments Worldwide and Egyptian Challenges

International Journal of Industry and Sustainable Development
2020English

Measuring Winners and Losers From the New I-35w Mississippi River Bridge

Transportation
CivilDevelopmentTransportationStructural Engineering
2016English

The Case of the New Tagus River Leziria Bridge

2016English

Holocene Vegetation History From King River Railway Bridge, Western Tasmania

Papers and Proceedings - Royal Society of Tasmania
Multidisciplinary
1991English

River Meander Modeling of the Wabash River Near the Interstate 64 Bridge Near Grayville, Illinois

Scientific Investigations Report
2018English

Local Scour Around the Piers of the Shimanto River Bridge

PROCEEDINGS OF HYDRAULIC ENGINEERING
2003English

Amanote Research

Note-taking for researchers

Follow Amanote


© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy