Integrating Mobile Bed Numerical Modelling Into Reservoir Planning Operations: The Case Study of the Hydroelectric Plant in Isola Serafini (Italy)

doi 10.2495/ws130061
Full Text
Abstract

Available in full text

Date
Authors
Publisher

WIT Press