Amanote Research

Amanote Research

    RegisterSign In

Optimization of Ring Blasting in Sublevel Stoping Gold Mine

Podzemni radovi
doi 10.5937/podrad1833061d
Full Text
Open PDF
Abstract

Available in full text

Date

January 1, 2018

Authors
Miodrag DuranovićNemanja ĐokićVeljko LapčevićSlavko TorbicaMilenko PetrovićLjiljana Savić
Publisher

Centre for Evaluation in Education and Science (CEON/CEES)


Related search

The Improved Shrinkage Stoping at Ôtani Mine

Journal of the Mining and Metallurgical Institute of Japan
1957English

Assessment of Blasting Quality of an Opencast Mine

International Journal of Innovative Technology and Exploring Engineering
Mechanics of MaterialsElectronic EngineeringCivilStructural EngineeringElectricalComputer Science
2019English

Value Creation in a Mine Operating With Open Stoping Mining Methods

Journal of the Southern African Institute of Mining and Metallurgy
2017English

Problems in the Application of Sublevel Caving Method in the Underground Mine Jama Bor

Rudarski radovi, Bor
2012English

Stability of Underground Mine Workings Due to Surface Blasting

2016English

Amazon Mechanical Turk: Gold Mine or Coal Mine?

Computational Linguistics
LinguisticsComputer Science ApplicationsArtificial IntelligenceLanguage
2011English

Leviathans at the Gold Mine

2014English

The Rural Education Gold Mine

Educational Considerations
1989English

Study on Seismic Wave Propagation Characteristic of Deep-Hole Loose Blasting in Coal Mine

2013English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy