Amanote Research

Amanote Research

    RegisterSign In

Timing Analysis of PWR Fuel Pin Failures

doi 10.2172/7104184
Full Text
Open PDF
Abstract

Available in full text

Date

September 1, 1992

Authors
K.R. JonesN.L. WadeK.R. KatsmaL.J. SiefkenM. Straka
Publisher

Office of Scientific and Technical Information (OSTI)


Related search

Advanced Fabrication Technique and Thermal Performance Prediction of U‐Mo/Zr‐alloy Dispersion Fuel Pin for High Burnup PWR

2010English

Nuclear Analysis on the Enrichment of PWR Fuel in a Fusion Hybrid Reactor

1978English

Proving Test on Reliability of PWR Fuel Assembly.

Journal of the Atomic Energy Society of Japan / Atomic Energy Society of Japan
1989English

Parametric Analysis of PWR Spent Fuel Depletion Parameters for Long-Term-Disposal Criticality Safety

1999English

Erratum to : Evaluation of Fuel Performance in Reactor (PWR)

Journal of the Atomic Energy Society of Japan / Atomic Energy Society of Japan
1984English

Design and Fuel Management of PWR Cores to Optimize the Once-Through Fuel Cycle

1978English

Significance-Driven Data Truncation for Preventing Timing Failures

IEEE Transactions on Device and Materials Reliability
Electronic EngineeringRiskElectronicOpticalReliabilityElectricalMagnetic MaterialsSafetyQuality
2019English

Fuel Performance Annual Report, Period Through December 1978. [PWR; BWR]

1979English

Treatment of Staggered Mesh for BWR Pin-By-Pin Core Analysis

Journal of Nuclear Science and Technology
High Energy PhysicsNuclearEngineeringNuclear Energy
2009English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy