Amanote Research

Amanote Research

  • Register
  • Sign In

Shield Tunnels Connected to an Operating Station - A Case Study in Taipei MRT Projects

Japanese Geotechnical Society Special Publication

doi 10.3208/jgssp.sea-19

Full Text

Abstract

Available in

Date

January 1, 2016

Authors

J.F. ChangC.R. ChouY.F. LaiY.H. Hsieh

Publisher

The Japanese Geotechnical Society


Related search

Walking Distance Perception in Jakarta MRT Station Area*

2020Indonesian

A Case Study of Twin Bored Tunnelling Under Mixed-Face Soil - Bendemeer MRT Station Project (Downtown Line 3), Singapore

Japanese Geotechnical Society Special Publication
2016English

The Study of Urban Track Transportation Environmental Noise and Vibration Prevention: Floating Slab Track of Taipei MRT

2010English

Erratum to : HISTORICAL DEVELOPMENT OF CONCRETE OF SHIELD DRIVEN RAILWAY TUNNELS

Doboku Gakkai Ronbunshu
1993English

Numerical Investigation of Mechanized Shield Tunnels Cross-Cut

Journal of Aalytical and Numerical Methods in Mining Engineering
2018English

GPS Application on Huge Construction Project- A Feasibility Investigation for Taipei MRT Long-Term Network

2000English

Practices and Processes in BIM Projects: An Exploratory Case Study

Advances in Civil Engineering
CivilStructural Engineering
2018English

Molecular Tunnels in Enzymes and Thermophily: A Case Study on the Relationship to Growth Temperature

Microorganisms
VirologyMicrobiology
2018English

Public-Private Partnership Model Used in the Taipei Central Station Project Research

Journal of Psychology Research
2018English

Amanote Research

Note-taking for researchers

Follow Amanote


© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy