Amanote Research

Amanote Research

    RegisterSign In

Shield Tunnels Connected to an Operating Station - A Case Study in Taipei MRT Projects

Japanese Geotechnical Society Special Publication
doi 10.3208/jgssp.sea-19
Full Text
Open PDF
Abstract

Available in full text

Date

January 1, 2016

Authors
J.F. ChangC.R. ChouY.F. LaiY.H. Hsieh
Publisher

The Japanese Geotechnical Society


Related search

Walking Distance Perception in Jakarta MRT Station Area*

2020English

A Case Study of Twin Bored Tunnelling Under Mixed-Face Soil - Bendemeer MRT Station Project (Downtown Line 3), Singapore

Japanese Geotechnical Society Special Publication
2016English

Erratum to : HISTORICAL DEVELOPMENT OF CONCRETE OF SHIELD DRIVEN RAILWAY TUNNELS

Doboku Gakkai Ronbunshu
1993English

GPS Application on Huge Construction Project- A Feasibility Investigation for Taipei MRT Long-Term Network

2000English

The Study of Urban Track Transportation Environmental Noise and Vibration Prevention: Floating Slab Track of Taipei MRT

2010English

Numerical Investigation of Mechanized Shield Tunnels Cross-Cut

Journal of Aalytical and Numerical Methods in Mining Engineering
2018English

Practices and Processes in BIM Projects: An Exploratory Case Study

Advances in Civil Engineering
CivilStructural Engineering
2018English

Molecular Tunnels in Enzymes and Thermophily: A Case Study on the Relationship to Growth Temperature

Microorganisms
VirologyMicrobiology
2018English

Public-Private Partnership Model Used in the Taipei Central Station Project Research

Journal of Psychology Research
2018English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy