Amanote Research

Amanote Research

    RegisterSign In

Equipment for Development and Evaluation of Alternate Processes for Plutonium Metal Production: 234-5 Project, Problem Assignment 5-3

doi 10.2172/48233
Full Text
Open PDF
Abstract

Available in full text

Date

July 1, 1948

Authors
D.W. Haught
Publisher

Office of Scientific and Technical Information (OSTI)


Related search

Analytical Development 234-5 Project Progress Report

1948English

234-5 Project, Hydrofluorination Cycle

1947English

Production of ``X`` Buttons in the 234-5 Building

1952English

Synthesis and Evaluation as Antitubercular Agents of 5-Arylethenyl and 5-(Hetero)aryl-3-Isoxazolecarboxylate

Drug Development Research
Drug Discovery
2012English

Evaluation Techniques for TV Pictures (5)

The Journal of the Institute of Television Engineers of Japan
1984English

Preparation and Evaluation of Chitosan Based Thermoreversible Gels for Intraperitoneal Delivery of 5-Fluorouracil (5-Fu)

Acta Pharmaceutica
MedicinePharmacologyPharmaceutical Science
2013English

Computation of Cyclic Parts of Steinhaus Problem for Power 5

Acta Arithmetica
Number TheoryAlgebra
1962English

Development of Processes and Equipment for Recovering Uranium From Rover- Fuels-Burner Ash

1973English

Design Criteria -- Reactor Plant Modification for Increased Production and 100-C Area Alterations, Project CG-558 and Project CG-600. Volume 5

1955English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy