Amanote Research

Amanote Research

    RegisterSign In

Experiments, Conceptual Design, Preliminary Cost Estimates and Schedules for an Underground Research Facility

doi 10.2172/5361754
Full Text
Open PDF
Abstract

Available in full text

Date

September 1, 1981

Authors
G. KorbinH. WollenbergC. WilsonB. StrisowerT. ChanD. Wedge
Publisher

Office of Scientific and Technical Information (OSTI)


Related search

Lead Coolant Test Facility Technical and Functional Requirements, Conceptual Design, Cost and Construction Schedule

2006English

Conceptual Design of an RTG Shipping and Receiving Facility Transportation System

AIP Conference Proceedings
AstronomyPhysics
1995English

Design Study and Cost Estimate for an Assurred Isolation Facility in Texas

1999English

Long-Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE): Conceptual Design Report. Volume 1: The LBNF and DUNE Projects

2016English

Conceptual Design of a Nuclear Waste Vitrification Facility

1978English

Conceptual Design of a Stray Light Facility for Earth Observation Satellites

2017English

Fort Hood Solar Cogeneration Facility Conceptual Design Study

1981English

RHIC Internal Beam Dump Preliminary Conceptual Design

1988English

Conceptual Design of a Laser Fusion Power Plant. Part I. An Integrated Facility

1981English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy