Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using a 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran
Journal of Aalytical and Numerical Methods in Mining Engineering
doi 10.29252/anm.8.17.27
Full Text
Open PDFAbstract
Available in full text
Date
April 1, 2019
Authors
Publisher
Armenian Green Publishing Co.