Amanote Research

Amanote Research

    RegisterSign In

Design, Qualification, QAQC and Operational Performance of Completion Fluid, Reservoir Drill-In Fluid and Breaker - Tamar, Offshore Israel

doi 10.2118/173060-ms
Full Text
Open PDF
Abstract

Available in full text

Date

January 1, 2015

Authors
John HealyJack SanfordTim HopperKerby DufreneJosh FinkChristian BalderramaVickers SteveGrant Mackenzie
Publisher

Society of Petroleum Engineers


Related search

Operational and Performance Qualification of 35 Liter Cryostorage Dewar Tanks by Weight Measurement-Fluid Level Correlations

Fertility and Sterility
GynecologyReproductive MedicineObstetrics
2019English

The Study of Formulation and Performance of Formate Drilling and Completion Fluid System

Natural Science
2013English

Description and Regulation of Drilling Completion Fluid Cake Structure

Open Journal of Yangtze Oil and Gas
2018English

Fluid Assisted Compaction and Deformation of Reservoir Lithologies

2002English

2-Fluid Flooding in Dipping Reservoir

Journal of the Japanese Association for Petroleum Technology
1957English

Complex Reservoir Drilling Fluid Solutions for Reservoir Drilling

AGH Drilling, Oil, Gas
2019English

Koci Drill for Drilling in Ice, Sand and Rock: Drill Requirements, Design, Performance, Difficulties

Annals of Glaciology
Earth-Surface Processes
2007English

New Tools for Oil and Gas Reservoir Fluid Management

Revue de l'Institut Français du Pétrole
1998English

Handling Commercial, Operational and Technical Uncertainty in Early Stage Offshore Ship Design

2016English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy