Amanote Research

Amanote Research

    RegisterSign In

A Polling Based Approach for Delay Analysis of WiMAX/IEEE 802.16 Systems

International Journal of Advance Engineering and Research Development
doi 10.21090/ijaerd.010586
Full Text
Open PDF
Abstract

Available in full text

Date

May 31, 2014

Authors

Unknown

Publisher

International Journal of Advance Engineering and Research Development (IJAERD)


Related search

Interference-Aware IEEE 802.16 WiMax Mesh Networks

English

An Overview of the Development and Potential Impact of the IEEE 802.16 (WiMAX) Standard

2012English

Utilizing IEEE 802.16 for Aeronautical Communications

2011English

A Source-Based Multicast Scheme in IEEE 802.16 Mesh Mode

International Journal of Wireless and Microwave Technologies
2012English

An Evaluation of the Effects of Propagation Channels on the Performance of WiMAX (IEEE 802.16-2004)

2010English

Proposal of a Novel Bandwidth Management Framework for IEEE 802.16 Based on Aggregation

2008English

A Two-Layer Channel-Aware Scheduling Algorithm for IEEE 802.16 Broadband Wireless Access Systems

Journal of Applied Sciences
2009English

WiMAX 802.16 Networks: Threats, Attacks, and Solutions

The International Conference on Electrical Engineering
2012English

Analysis of Bandwidth Efficiency in IEEE 802.11 and 802.16 Interworking Networks

International Journal of Wireless Networks and Broadband Technologies
2018English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy