Amanote Research

Amanote Research

    RegisterSign In

An Over-Damped Cavity Longitudinal Kicker for the PEP-II LER

doi 10.2172/815603
Full Text
Open PDF
Abstract

Available in full text

Date

July 30, 2003

Authors
P McIntosh
Publisher

Office of Scientific and Technical Information (OSTI)


Related search

Detection of Instrumental Drifts in the PEP-II LER BPM System

2007English

Design of a High-Power Test Model of the PEP-II RF Cavity

English

PEP II Meeting

PAGES news
1998English

PEP-II Alignment

2003English

Beam-Beam Simulations for Pep-Ii

2002English

Significant Lifetime and Background Improvements in Pep-Ii by Reducing the 3rd Order Chromaticity in Ler With Orbit Bumps

2007English

Operation of PEP Longitudinal Feedback System

IEEE Transactions on Nuclear Science
Electronic EngineeringNuclearNuclear EnergyHigh Energy PhysicsEngineeringElectrical
1981English

Design of Longitudinal Feedback System Kicker for the PLS Storage Ring

English

RF Feedback Simulation Results for PEP-II

English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy