Amanote Research

Amanote Research

    RegisterSign In

The ATLAS Trigger System: Ready for Run-2

doi 10.22323/1.245.0045
Full Text
Open PDF
Abstract

Available in full text

Date

November 28, 2016

Authors
Moritz Backes
Publisher

Sissa Medialab


Related search

Performance of the ATLAS Tau Trigger in Run 2

2017English

The ATLAS Run-2 Trigger: Design, Menu, Performance and Operational Aspects

2017English

ATLAS Jet Trigger Update for the LHC Run II

2015English

Performance of the ATLAS Tau-Lepton Trigger at the LHC in Run 2

2019English

Software-Based Data Acquisition System for Level-1 End-Cap Muon Trigger in Atlas Run-3

EPJ Web of Conferences
AstronomyPhysics
2019English

A Fast Hardware Tracker for the ATLAS Trigger System

Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
High Energy PhysicsInstrumentationNuclear
2013English

ATLAS Calorimeter System: Run-2 Performance, Phase-1 and Phase-2 Upgrades

2019English

The ATLAS High Level Trigger Steering Framework and the Trigger Configuration System

2011English

ATLAS LUCID Detector Upgrade for LHC Run 2

2016English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy