Amanote Research

Amanote Research

    RegisterSign In

End-To-End Delay Analysis in an Integrated Modular Avionics Architecture

doi 10.1109/etfa.2013.6648155
Full Text
Open PDF
Abstract

Available in full text

Date

September 1, 2013

Authors
Nesrine BadacheKatia Jaffres-RunserJean-Luc ScharbargChristian Fraboul
Publisher

IEEE


Related search

Towards an End-To-End Delay Analysis of Wireless Multihop Networks

Ad Hoc Networks
HardwareComputer NetworksSoftwareArchitectureCommunications
2009English

Scheduling Independent Partitions in Integrated Modular Avionics Systems

PLoS ONE
Multidisciplinary
2016English

End-To-End Delay Estimation Using RPL Metrics in WSN

2013English

Cross-Layer Analysis of the End-To-End Delay Distribution in Wireless Sensor Networks

2009English

Functional Architecture of End-To-End Reconfigurable Systems

English

A Modeling Paradigm for Integrated Modular Avionics Design

2006English

Reducing End to End Delay in Delay Tolerant Mobile Network Using AODV and Cluster-Based Routing Protocol

Research Journal of Applied Sciences
EngineeringMultidisciplinaryPhysicsAstronomyChemistry
2012English

Performance Analysis of MAC Protocols for Location-Independent End-To-End Delay in Multi-Hop Wireless Mesh Networks

2011English

A Modular Microfluidic Architecture for Integrated Biochemical Analysis

Proceedings of the National Academy of Sciences of the United States of America
Multidisciplinary
2005English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy