Amanote Research

Amanote Research

    RegisterSign In

A Timed Petri Net Model for the Quay Crane Scheduling Problem

doi 10.7148/2014-0441
Full Text
Open PDF
Abstract

Available in full text

Date

May 27, 2014

Authors
Roberto Trunfio
Publisher

ECMS


Related search

Simulation Optimization Based Ant Colony Algorithm for the Uncertain Quay Crane Scheduling Problem

International Journal of Industrial Engineering Computations
IndustrialManufacturing Engineering
2019English

Addressing a Coordinated Quay Crane Scheduling and Assignment Problem by Red Deer Algorithm

International Journal of Engineering, Transactions B: Applications
Engineering
2019English

Modeling of Updating Moving Object Database Using Timed Petri Net Model

IJCI. International Journal of Computers and Information
2007English

Adaptive Scheduling Model in Hybrid Flowshop Production Control Using Petri Net

International Journal of Control and Automation
ControlSystems Engineering
2015English

Parallel Application Scheduling Model Based on Petri Net With Changeable Structure

2010English

The Derivation of Performance Expressions for Communication Protocols From Timed Petri Net Models

1984English

Optimization for Manufacturing Process Based on Timed Petri Net and Genetic Algorithm

2016English

A Petri Net-Based Hybrid Heuristic Scheduling Algorithm for Flexible Manufacturing System

International Journal of Simulation Modelling
ModelingComputer Science ApplicationsSimulation
2019English

Towards a Certified Petri Net Model-Checker

Lecture Notes in Computer Science
Computer ScienceTheoretical Computer Science
2011English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy