Amanote Research

Amanote Research

    RegisterSign In

Loading Diagrams of Experimental Subassemblies Starting Irradiation in EBR- II Runs 63-76

doi 10.2172/4214555
Full Text
Open PDF
Abstract

Available in full text

Date

February 1, 1975

Authors
J C CaseW J Larson
Publisher

Office of Scientific and Technical Information (OSTI)


Related search

Loading Diagrams of Experimental Subassemblies Irradiated in Ebr-Ii Runs 5 Through 42.

1970English

Results of Irradiation of Nickel-Reflector Test Subassemblies.

1971English

EVALUATION OF THE EBR-II REACTOR-BUILDING ISOLATION SYSTEM. EBR-II Project.

1971English

CONCEPTUAL SYSTEM DESIGN DESCRIPTION OF THE EBR-II IN-CORE INSTRUMENT TEST FACILITY. EBR-II Project.

1969English

Design Basis of the F9e Grid Spaced LMFBR Diagnostic Assembly for Irradiation Test in Ebr-Ii.

1971English

Stability Considerations for a Plutonium Loading in Ebr-I

1964English

The Manufacture of Centrifugally Cast Alloy Fuel Slugs (Mark-Ii Fuel Loading for Ebr-I)

1960English

POST-IRRADIATION EXAMINATION OF HIGH-DENSITY (UPu)C PELLET-FUELED EBR-II RODS IRRADIATED TO 30,000 MWD/T.

1968English

Tritium Retention in EBR-II-irradiated Boron Carbide

1974English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy