Assessment of the Long-Lead Probabilistic Prediction for the Asian Summer Monsoon Precipitation (1983-2011) Based on the APCC Multimodel System and a Statistical Model

Journal of Geophysical Research - United States
doi 10.1029/2011jd016308

Related search