Amanote Research
Register
Sign In
Critical Path-Based Thread Placement for NUMA Systems
doi 10.1145/2088457.2088471
Full Text
Open PDF
Abstract
Available in
full text
Date
January 1, 2011
Authors
ChunYi Su
Dong Li
Dimitrios Nikolopoulos
Matthew Grove
Kirk W. Cameron
Bronis R. de Supinski
Publisher
ACM Press
Related search
Critical Path-Based Thread Placement for NUMA Systems
Performance Evaluation Review
Hardware
Computer Networks
Software
Architecture
Communications
Critical Analysis for Memory Management Algorithm for NUMA Based Real Time Operating System
International Journal of Engineering and Technology
Transfer Processes
Fluid Flow
Mechanical Engineering
Aerospace Engineering
Noninterference for Concurrent Programs and Thread Systems
Theoretical Computer Science
Computer Science
Theoretical Computer Science
Simultaneous Thin-Thread Processors for Low-Power Embedded Systems
IEICE Electronics Express
Electronic Engineering
Condensed Matter Physics
Optical
Electrical
Magnetic Materials
Electronic
Critical Path Reduction of Distributed Arithmetic Based FIR Filter
International Journal of Advanced Computer Science and Applications
Computer Science
A Hierarchical Processor Scheduling Policy for NUMA Systems.
A Path Planning Algorithm of Closed Surface for Fiber Placement
Cooperative Path Planning for Timing-Critical Missions
Resource-Activity Critical-Path Method for Construction Planning
Journal of Construction Engineering and Management - ASCE
Building
Industrial Relations
Management
Civil
Structural Engineering
Strategy
Construction