Amanote Research

Amanote Research

    RegisterSign In

OVERVIEW AND STATUS OF THE 12 GeV CRYOGENIC SYSTEM UPGRADE AT JLAB

doi 10.1063/1.3422270
Full Text
Open PDF
Abstract

Available in full text

Date

January 1, 2010

Authors
D. AreniusJ. CreelK. DixonV. GanniP. KnudsenJ. G. Weisend
Publisher

AIP


Related search

Status and Perspectives of the ASDEX Upgrade Gas Inlet System

Fusion Engineering and Design
Materials ScienceMechanical EngineeringCivilNuclear EnergyStructural EngineeringEngineering
2015English

Neutron Beam Line at the KEK 12-GeV PS

Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
High Energy PhysicsInstrumentationNuclear
1996English

Photon and $\Pi^0$ Electroproduction in Jlab Hall a (6 GeV Experiements)

2018English

Design of New Control System for the KEK 12 GeV PS

IEEE Transactions on Nuclear Science
Electronic EngineeringNuclearNuclear EnergyHigh Energy PhysicsEngineeringElectrical
1985English

Overview of LHCb-RICH Upgrade

Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
High Energy PhysicsInstrumentationNuclear
2017English

The lowQ2chicane and Compton Polarimeter at the JLab EIC

EPJ Web of Conferences
AstronomyPhysics
2016English

ANKA-status of the 2.5 GeV Synchrotron Light Source at Forschungszentrum Karlsruhe

English

The Hall D Physics Program at JLab

2013English

Cryogenic Testing of the RF Input Waveguide for the CEBAF Upgrade Cryomodule

English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy