An Analysis of the Annual Probability of Failure of the Waste Hoist Brake System at the Waste Isolation Pilot Plant (WIPP)
doi 10.2172/167172
Full Text
Open PDFAbstract
Available in full text
Date
November 1, 1995
Authors
Publisher
Office of Scientific and Technical Information (OSTI)