Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption

Advances in Operations Research - United States
doi 10.1155/2020/9732563
Full Text
Abstract

Available in full text

Date
Authors
Publisher

Hindawi Limited