Amanote Research

Amanote Research

    RegisterSign In

Test Scheduling in an IEEE P1687 Environment With Resource and Power Constraints

doi 10.1109/ats.2011.80
Full Text
Open PDF
Abstract

Available in full text

Date

November 1, 2011

Authors
Farrokh Ghani ZadeganUrban IngelssonGolnaz AsaniGunnar CarlssonErik Larsson
Publisher

IEEE


Related search

Integrated Resource Management and Scheduling With Multi-Resource Constraints

English

Accessing Embedded DfT Instruments With IEEE P1687

2012English

An Approach to Steadfast and Reliable Resource Scheduling in Cloud Environment

IOSR Journal of Computer Engineering
2014English

Radio Resource Allocation With QoS Constraints in Energy Harvesting and Hybrid Power Systems

Journal of Communication and Information Systems
2018English

Energy Resource Scheduling Considering Reactive Power Management

2012English

Power Constrained Test Scheduling Using Power Profile Manipulation

2001English

Evaluating the Effect of Resource Constraints on Resilience of Bulk Power System With an Electric Power Restoration Model

International Journal of System of Systems Engineering
HardwareInformation SystemsArchitecture
2014English

Scheduling Tests for VLSI Systems Under Power Constraints

IEEE Transactions on Very Large Scale Integration (VLSI) Systems
HardwareElectronic EngineeringElectricalArchitectureSoftware
1997English

A Hybrid Exact Method for a Scheduling Problem With a Continuous Resource and Energy Constraints

Constraints
CombinatoricsMathematicsDiscrete MathematicsComputational TheoryArtificial IntelligenceSoftware
2015English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2025 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy