Amanote Research

Amanote Research

    RegisterSign In

Is Integration of Uncertainty Management and the Last Planner System a Good Idea?

doi 10.24928/2018/0218
Full Text
Open PDF
Abstract

Available in full text

Date

July 18, 2018

Authors
Olav TorpTrond BølvikenSigmund AslesenLars Petter FritzsønnÅse HaagensenSebastiano LombardoTobias Saltveit
Publisher

International Group for Lean Construction


Related search

Integration of LEAN Last Planner System in Construction Processes

2019English

The Development and Use of Last Planner® System (LPS) Guidance

2019English

Establishing a Link Between the Last Planner System and Simulation: A Conceptual Framework

2019English

Simulation Exercise for Collaborative Planning System / Last Planner System (COLPLASSE)

2018English

Singularity Functions to Enhance Monitoring in the Last Planner System

2019English

The Beauty of a Phase-Overlapping Last Planner System® With Incorporated Takt

2019English

Case Study in the Application of the Last Planner® System

2019English

The Importance of Integration Waste Management Aspects as a System in Good and Sustainable Waste Management

E3S Web of Conferences
EarthEnergyPlanetary SciencesEnvironmental Science
2018English

Is Promoting War Trauma Such a Good Idea?

Anthropology Today
Anthropology
2019English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy