Amanote Research

Amanote Research

    RegisterSign In

Establishing a Link Between the Last Planner System and Simulation: A Conceptual Framework

doi 10.24928/2019/0200
Full Text
Open PDF
Abstract

Available in full text

Date

July 3, 2019

Authors
Mohammed A. AbdelmegidVicente A. GonzálezMichael O’SullivanCameron G. WalkerMani PoshdarLuis Fernando Alarcón
Publisher

International Group for Lean Construction


Related search

Simulation Exercise for Collaborative Planning System / Last Planner System (COLPLASSE)

2018English

Establishing a Link Between Contractor Selection Strategy and Project Outcomes: Simulation Study

Journal of Construction Engineering and Management - ASCE
BuildingIndustrial RelationsManagementCivilStructural EngineeringStrategyConstruction
2019English

The Relationship Between the Last Planner® System and Collaborative Planning Practice in UK Construction

Engineering, Construction and Architectural Management
BuildingManagementBusinessCivilStructural EngineeringConstructionArchitectureAccounting
2017English

Is Integration of Uncertainty Management and the Last Planner System a Good Idea?

2018English

The Beauty of a Phase-Overlapping Last Planner System® With Incorporated Takt

2019English

The Development and Use of Last Planner® System (LPS) Guidance

2019English

The Last Planner® System Path Clearing Approach in Action: A Case Study

2018English

Singularity Functions to Enhance Monitoring in the Last Planner System

2019English

Medical Records: A Framework for Establishing a Record System.

BMJ
1981English

Amanote Research

Note-taking for researchers

Follow Amanote

© 2026 Amaplex Software S.P.R.L. All rights reserved.

Privacy PolicyRefund Policy